top of page
9.png

YUSUFELI CENTRAL VIADUCT

The project, in which we have manufactured the 685-meter-long, 7500-ton steel bridge deck with the latest technology systems and assembled it using the two-way pushing-sliding method, is ongoing.

PROJECT GALLERY

bottom of page